Saturday, June 7, 2025
  • Login
Asia News Observer
  • Home
  • J&K
  • Special
  • National
  • Health
  • Sports
No Result
View All Result
Asia News Observer
  • Home
  • J&K
  • Special
  • National
  • Health
  • Sports
No Result
View All Result
Plugin Install : Cart Icon need WooCommerce plugin to be installed.
Asia News Observer
No Result
View All Result
Home J&K

REC okays Rs 1,869 crore loan for Kiru hydro project in J&K

REC okays Rs 1,869 crore loan for Kiru hydro project in J&K
Share on Facebook

Gurugram, April 24: REC Limited, a Maharatna public sector company and a leading NBFC, has signed an agreement with Chenab Valley Power Project Private Limited (CVPPPL) for providing a term loan of Rs 1,869.26 crore.

The loan will be utilised for the development, construction and operation of the greenfield Kiru Hydro Electric Project (4×156 MW) on Chenab river located in Kishtwar district of Jammu and Kashmir.

Kiru Hydro Electric Project (624 MW), is a run-of-river scheme proposed on Chenab and is about 42 km from Kishtwar. The project envisages the construction of a 135-metre-high dam and an underground powerhouse with 4 units of 156 MW each.

The agreement was signed in the presence of CVPPPL Managing Director Ramesh Mukhiya, and Deputy General Manager Rishabh Jain from REC Limited.

RelatedPosts

“Personally Sad for Me, One Day the Govt Will Have to Trust People”: CM Omar Abdullah on Disallowing Prayers at Jama Masjid Srinagar

USBRL project features 36 tunnels, 943 bridges; Katra-Banihal section to host India’s longest railway tunnel: Senior Railway Official

Pak enemy of peace, development and humanity: PM Modi

CVPPPL is a Joint Venture Company between NHPC (51 per cent) and JKSPDC (49 per cent) formed at the initiative of the Jammu and Kashmir government and the Central government to harness the vast hydro potential of Chenab river.

The company was incorporated in 2011.

CVPPPL has been entrusted with the construction of Kiru HE Project (624 MW), Pakal Dul HE Project (1,000 MW), Kwar HE Project (540 MW), & Kirthai-II HE Project (930 MW) on Build, Own, Operate and Maintain (BOOM) basis with an aggregate installed capacity of 3,094 MW.–(IANS)

ShareTweetSend
Previous Post

Mehbooba Mufti’s Financial Decline: Assets Drop by Rs 13.34 Lakh in 5 years

Next Post

No action for short deduction of TDS, if PAN linked with Aadhaar by May 31

Related Posts

“Personally Sad for Me, One Day the Govt Will Have to Trust People”: CM Omar Abdullah on Disallowing Prayers at Jama Masjid Srinagar

June 7, 2025
USBRL project features 36 tunnels, 943 bridges; Katra-Banihal section to host India’s longest railway tunnel: Senior Railway Official

USBRL project features 36 tunnels, 943 bridges; Katra-Banihal section to host India’s longest railway tunnel: Senior Railway Official

June 6, 2025
Pak enemy of peace, development and humanity: PM Modi

Pak enemy of peace, development and humanity: PM Modi

June 6, 2025

“I Was the Chief Minister of a State… Now of a Union Territory — This Must Be Corrected Soon”: Omar at Katra event

June 6, 2025

PM Modi flags off train to Kashmir

June 6, 2025

PM Modi set to inaugurate Chenab railway bridge

June 6, 2025

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Facebook Twitter Instagram Youtube Telegram

About Us

Asia News Observer is a multimedia news portal based in Kashmir region of Jammu & Kashmir. We cover political, social and cultural dissent within the larger context of the conflict and its contours to provide an honest understanding of daily life.

NEWS BY TOPIC

  • Gaming / Technology
  • Health
  • International
  • J&K
  • Lead
  • National
  • News
  • Opinion
  • Special
  • Sports
  • Video

More Info

  • Home
  • Privacy Policy
  • Team
  • Contact Us
  • About Us

© 2020 ASIA NEWS OBSERVER - DESIGNED BY BUUCKET

No Result
View All Result
  • Home
  • J&K
  • Special
  • National
  • Health
  • Sports

© 2020 ASIA NEWS OBSERVER - DESIGNED BY BUUCKET

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
error: Content is protected !!