Monday, June 9, 2025
  • Login
Asia News Observer
  • Home
  • J&K
  • Special
  • National
  • Health
  • Sports
No Result
View All Result
Asia News Observer
  • Home
  • J&K
  • Special
  • National
  • Health
  • Sports
No Result
View All Result
Plugin Install : Cart Icon need WooCommerce plugin to be installed.
Asia News Observer
No Result
View All Result
Home J&K

Successful train runs on Katra-Reasi track bring rail closer to Kashmir

Tower Wagon chugs on India’s first cable-stayed railway bridge at Anji Khad

Successful train runs on Katra-Reasi track bring rail closer to Kashmir
Share on Facebook

Umaisar Gull Ganie

Katra, Dec 25: As Kashmir is all set to get rail connectivity, Northern Railway is giving final touches to the groundwork.

As a part of the preparations a successful train run, comprising an engine and goods train, was conducted on the 17-kilometer Katra-Reasi track on Wednesday. “Another trial run of a tower wagon was also conducted on India’s first cable-stayed railway bridge at Anji Khad, which is part of the USBRL (Udhampur-Srinagar-Baramulla Rail Link) project,” a senior Northern Railway official told news agency—Kashmir News Observer (KNO).

“The engine trial train ran at 30 km/h, and the goods train at 20 km/h. The trial will continue until the final inspection,” he added.

RelatedPosts

Man killed, 2 injured in Verinag accident

Northern Railways begins commercial operations of Vande Bharat train between Katra and Srinagar

“Personally Sad for Me, One Day the Govt Will Have to Trust People”: CM Omar Abdullah on Disallowing Prayers at Jama Masjid Srinagar

Another official, who is also part of the train operations on the USBRL project, said that the speed of the engines will be increased in future. “Very soon electric engines will also chug on this line,” he added.

Union Minister for Railways, Ashwini Vaishnaw, posted on X: “Trial run of tower wagon on India’s First Cable-Stayed Railway Bridge at Anji Khad for USBRL Project in J&K.”

While giving the details of the upcoming railway operations on the Udhampur-Srinagar-Baramulla Rail Link officials told KNO that from January 5 to January 6, 2025, statutory inspections will be conducted for the opening of the Katra-Reasi (16.501 km) section. “This section is part of the Udhampur-Srinagar-Baramulla New Broad Gauge (B.G.) Rail Link Project. The inspection will start at 20:50 hrs on January 5 and conclude at 07:55 hrs on January 6,” they added.

The Commissioner of Railways Safety (CRS) is expected to submit an inspection report to the Union Government on January 8.

Its in place to mention here that the Phase-I of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) Project, covering the 118-km-long Qazigund-Baramulla section, was inaugurated in October 2009. Subsequent phases included the inauguration of the 18-km-long Banihal-Qazigund section in June 2013 and the 25-km-long Udhampur-Katra section in July 2014.

In February, the first electric train trial run on the Banihal-Katra section of the USBRL project was successfully conducted on approximately 40 km of track and tunnels between Banihal and Sangaldan Railway Stations in Ramban district.

The USBRL Project involves 38 tunnels with a combined length of 119 km. The longest tunnel, T-49, measures 12.75 km, making it the country’s longest transportation tunnel. The project also includes 927 bridges with a combined length of 13 km.

Among these is the iconic Chenab Bridge, with an overall length of 1,315 m, an arch span of 467 m, and a height of 359 m above the riverbed. This bridge stands about 35 meters taller than the Eiffel Tower and is recognized as the world’s highest arch railway bridge—(KNO)

ShareTweetSend
Previous Post

Farmers worried, expect less production of Rabi crops due to dry spell

Next Post

From Leh to Kanyakumari: Rajasthan cyclist on mission for ‘Drug-Free India’

Related Posts

Udhampur mishap: Four of a family missing, one body recovered

Man killed, 2 injured in Verinag accident

June 8, 2025
Northern Railways begins commercial operations of Vande Bharat train between Katra and Srinagar

Northern Railways begins commercial operations of Vande Bharat train between Katra and Srinagar

June 8, 2025

“Personally Sad for Me, One Day the Govt Will Have to Trust People”: CM Omar Abdullah on Disallowing Prayers at Jama Masjid Srinagar

June 7, 2025

KU gets A++ grade in NAAC re-accreditation cycle

June 6, 2025

USBRL project features 36 tunnels, 943 bridges; Katra-Banihal section to host India’s longest railway tunnel: Senior Railway Official

June 6, 2025

Pak enemy of peace, development and humanity: PM Modi

June 6, 2025

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Facebook Twitter Instagram Youtube Telegram

About Us

Asia News Observer is a multimedia news portal based in Kashmir region of Jammu & Kashmir. We cover political, social and cultural dissent within the larger context of the conflict and its contours to provide an honest understanding of daily life.

NEWS BY TOPIC

  • Gaming / Technology
  • Health
  • International
  • J&K
  • Lead
  • National
  • News
  • Opinion
  • Special
  • Sports
  • Video

More Info

  • Home
  • Privacy Policy
  • Team
  • Contact Us
  • About Us

© 2020 ASIA NEWS OBSERVER - DESIGNED BY BUUCKET

No Result
View All Result
  • Home
  • J&K
  • Special
  • National
  • Health
  • Sports

© 2020 ASIA NEWS OBSERVER - DESIGNED BY BUUCKET

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
error: Content is protected !!