Youth Association kokergund Alleges Material Fraud in Link Road Construction
Muneeb Nazeer
Kulgam, July 22: Fresh concerns have emerged from Kokergund village in Yaripora, Kulgam, where locals have alleged that the newly constructed link road is being built using wet soil instead of standard stone dust or dry base material a deviation they say could severely compromise the road’s durability.
Youth association Kokergund told the News Agency _JKNS, That contractor, despite having an approved estimate of ₹9 lakh, has compromised on the material quality. As per locals, the contractor used only 9 dumber (truckloads) of stones and 2 dumber of wet soil, skipping the mandatory use of fine dust which is essential for a stable and long-lasting road base.
“They are playing with public money and risking our safety. This road will collapse in no time,” said a visibly agitated resident, accusing the contractor of cost-cutting at the expense of quality.
The muddy base, locals say, increases the risk of early wear and tear, especially with the upcoming rainy season approaching.
Experts caution that the use of wet soil can lead to uneven surfaces, erosion, and waterlogging, significantly reducing the road’s life span.
Locals have urged the district administration to intervene immediately, demanding a technical inspection and a halt to ongoing work until proper construction materials are used. (JKNS)